Loading

Bothell Remodel & Remediation Completed December 2021

425.328.8179

Mold remediation project inside window sill and walls, with us having removed windows and reinstalled correctly. Surfaces sprayed with killz primer
External windows no flashing applied to window and window not correctly installed causing window to leak. Roof was incomplete so we installed a pvc roof membrane and installed facia to ensure the roof was sealed correctly
External windows no flashing applied to window and window not correctly installed causing window to leak. Roof was incomplete so we installed a pvc roof membrane and installed facia to ensure the roof was sealed correctly
External windows no flashing applied to window and window not correctly installed causing window to leak. Roof was incomplete so we installed a pvc roof membrane and installed facia to ensure the roof was sealed correctly
Before we tied the building into the existing siding with Hardie Board Siding
Before we tied the building into the existing siding with Hardie Board Siding