Three-story, 317,000 SF high school, which will accommodate 1,600 students, contains new classrooms, state-of-the-art industrial arts labs and shop spaces, and an 825-seat auditorium, gymnasium, and a large commons/cafeteria space in the center of the building. The new high school will be located on a 90-acre site with parking lots for 890 vehicles. The project also includes a five-station field house with walking track, a 3,451-seat football stadium, eight tennis courts, four soccer/lacrosse fields, two softball fields, two baseball fields, and a synthetic turf field and full track at the stadium.
Construction is expected to be completed in the summer of 2023.
MONTHLY UPDATES
SITE CONSTRUCTION
Work Started
- Plaza area planters and entrance
- Site furnishings
Work in Progress
- Site concrete paving (sidewalks and curbs)
- Site fencing
- Pour concrete plaza
- Parking lot signage
- Irrigation
- Site plantings
- Heated entry sidewalk
Work Completed
- Softball field synthetic turf
- Football stadium synthetic turf installation
- Pave the track
Work Upcoming Next Month
- Track & long jump surfacing
- Final lift on parking lots
- Tennis court acrylic coatings
- Sod installation
3-STORY CLASSROOM
Work Started
- Elevator install
- 1st floor cabinet install
Work in Progress
- Paint Industrial Technology spaces
- Install light fixtures in Industrial Technology spaces
- 1st floor doors and hardware
- Finish mechanical rooms serving classrooms
- 1st floor flooring
- Final clean and punchlist 3rd floor
- Final clean and punchlist 2nd floor
- 1st floor mechanical and electrical finishes
- 1st floor tile install
- Exterior window finishes
- Mechanical penthouse finishes
- Industrial Technologies MEP rough-ins
Work Completed
- Balcony flooring finishes
- Finish 1st floor ceilings
- 1st floor grid install
- Flooring finishes 2nd floor
- Exterior metal panel installation
Work Upcoming Next Month
- Classroom teaching screen installation
- Final Clean
- Punchlist
ATHLETIC / ACTIVITIES SPACES
Work Started
- Painting activities hallway
- Ceiling grid in activities hallway
Work in Progress
- Finish tile in locker rooms
- Plumbing finishes in locker rooms
- Tile at locker rooms
- MEP finishes in locker rooms
- Terrazzo grinding in hallways
- Wood flooring at main gym
Work Completed
- Finish gym wood floor
- Auxiliary gym floor install
- Electrical in auxiliary gym
- Ceiling grid in fitness center
- MEP finishes in fitness center
Work Upcoming Next Month
- Fitness center floor install
- Interior glass install
- MEP Finishes @ Activities hallway
- Pad out activities hallway
COMMONS / CAFETERIA
Work Started
- Finish commons ceilings
- Wood paneling install
- Interior glass install
Work in Progress
- Main entrance door installation
- Pad out
- Kitchen equipment install
- Kitchen tile
- Kitchen ceilings
- Ceiling clouds in commons
- Main mechanical room rough-ins
- Commons terrazzo
Work Completed
- Sheetrock kitchen soffits
- Learning stair terrazzo install
- Drywall finishing at kitchen soffits
- Painting commons
- MEP rough-ins in ceilings
- Commons interior brick install
Work Upcoming Next Month
- Elevator inspection
AUDITORIUM/MUSIC SPACES
Work Started
- Auditorium stone install
- Music area MEP finishes
Work in Progress
- Stage MEP rough-ins
- Music area acoustical panel install
- Painting
Work Completed
- Frame auditorium side walls
- Music area ceiling grid
- Auditorium side wall wood panel installation
- MEP rough-ins throughout music spaces
- Paint music spaces
- Install sound isolation rooms in music spaces
- Control booth framed
- Chair lift installed
- Exterior glass install
Work Upcoming Next Month
- Paint stage
- Pad out
- Fixtures and devices
- Stage wood floor
- Install chairs
Kraus-Anderson
Jason Rentmeester, Senior Project Manager | jason.rentmeester@krausanderson.com
Michael Stenbeck, Project Manager | michael.stenbeck@krausanderson.com
Dan May, Project Manager | dan.may@krausanderson.com
Rob Gemelke, Project Manager | rob.gemelke@krausanderson.com
Randy Haram, Project Superintendent | randy.haram@krausanderson.com
Wold Architects and Engineers
Ben Beery, Associate | bbeery@woldae.com
Paul Aplikowski, Partner | paplikowski@woldae.com